East-West Arterial
The Environmental Impact Assessment for the East-West Arterial has now been completed.
The Environmental Statement was developed by the project proponent, the National Roads Authority (NRA), in collaboration with the Environmental Assessment Board which includes representatives from the Department of Environment (DoE), Department of Planning, Water Authority – Cayman, and the Public Works Department.
The National Roads Authority has undertaken this Environmental Impact Assessment for the proposed 8 miles (13 km) new roadway that starts at the end of Section 1 of the EWA (from Hirst Road to Woodland Drive), currently under construction, from the Woodland Drive/Agricola Drive Connector and travels east to a new intersection with Frank Sound Road. The Proposed Project also includes a series of new and improved roadways described as the Will T Connector. The results of the Environmental Impact Assessment studies are presented in the Environmental Statement, which will inform the decision-making process.
The final Environmental Statement and appendices can be downloaded below:
| File | Download Link |
|---|---|
| NCC Chair’s Cover Letter and EAB Final Comments | |
| NCC Chair’s Cover Letter | Download |
| Environmental Assessment Board’s Review of the East-West Arterial Final Environmental Statement | Download |
| Final Environmental Statement and Non-Technical Summary | |
| Environmental Statement | Download |
| Non-Technical Summary | Download |
| Environmental Management Plan – Initial Iteration | Download |
| Appendices | |
| Appendix A – Longlist [Alternative] Evaluation | Download |
| Appendix B – Ministry of PAHI Response to Longlist Alternatives Evaluation | Download |
| Appendix C – Land Use Planning Charrette Summary | Download |
| Appendix D – Ministry of PAHI Response to Future No-Build Scenario Assumptions | Download |
| Appendix E – Shortlist [Alternatives] Evaluation | Download |
| Appendix E, Attachment A – Traffic [Transportation & Mobility] – Assessment of Alternatives | Download |
| Appendix E, Attachment B – Engineering – Assessment of Alternatives | Download |
| Appendix E, Attachment C – Socio-Economic – Assessment of Alternatives | Download |
| Appendix E, Attachment D – Noise – Assessment of Alternatives | Download |
| Appendix E, Attachment E – Geo-Environmental – Assessment of Alternatives | Download |
| Appendix E, Attachment F – Terrestrial Ecology – Assessment of Alternatives | Download |
| Appendix E, Attachment G – Cultural & Natural Heritage – Assessment of Alternatives | Download |
| Appendix E, Attachment H – Hydrology & Drainage – Assessment of Alternatives | Download |
| Appendix E, Attachment I – Greenhouse Gases – Assessment of Alternatives | Download |
| Appendix E, Attachment J – Cost-Benefit Analysis – Assessment of Alternatives | Download |
| Appendix E, Attachment K – EAB Preferred Alternative Recommendation | Download |
| Appendix E, Attachment L – High-Level Summary Report of the EWA EIA Study Findings for the Selection of a Preferred Alternative | Download |
| Appendix E, Attachment M – PAHI-TD Memorandum – Cabinet Approval of Preferred Route and Press Release | Download |
| Appendix F.1 – Corridor Roll Maps | Download |
| Appendix F.2 – Bridge Structure Concept Plan Sheets | Download |
| Appendix G – Transportation and Mobility | Download |
| Appendix H – Noise and Vibration | Download |
| Appendix I – Greenhouse Gas Emissions | Download |
| Appendix J – Hydrology and Drainage | Download |
| Appendix K – Terrestrial Ecology | Download |
| Appendix L – Land Use Development Propensity Forecasting Technical Memo | Download |
| Appendix M – Cost-Benefit Analysis | Download |
| Appendix N – Public Comment Responses | Download |