EAB Scoping Opinion: Port EIA Update

An EIA for the Cruise Berthing Facility project was prepared in 2015 , however there has been an evolution of the design of the scheme assessed. There are fundamental changes to the CBCEP design which would result in the requirement to reassess the likely effects of the new design as the effects predicted in the original CBF EIA may no longer apply to the new project.

Download the update (5Mb)

Scroll to Top